Monday, 2 March 2009

The Project from Beginning to End


Wrought Iron Screens

I designed these screens about three weeks ago and it was
great to see them finally installed on the site.

La Fuente


Dinah sitting on the flatwork form, helping chisel out a path for the water spout plumbing.

The rough concrete after we pulled the plywood formwork off.

This was the form-work for the runnel that we pre-cast and then placed on the cast-in-place concrete portion of the fuente shown below.

Just finished the concrete skimcoating and ready for the runnel.

With the runnel was installed and the paint/waterproofing almost finished.

With the terra cotta spout installed and the plants in the bog garden in the back.

Off and running.

Monday, 16 February 2009

Steel Play Structures


The layers of paint, design and the high polish from use were captivating...


Mateo and Comolapa Trip with Mr. Fab and Benjamin